質(zhì)量目標 Quality objectives
分項工程100%達到合格,100%按圖施工,100%執(zhí)行合同條款,100%做好竣工后的服務(wù),確保達到一次性驗收合格工程。為了達到該質(zhì)量總目標,在施工全過程中,以目標管理統(tǒng)攬全局,以經(jīng)濟承包為杠桿,以全面推廣應(yīng)用ISO9001國標質(zhì)量標準為手段,開展質(zhì)量管理工作,將單位工程質(zhì)量總目標分成各分部工程、分項工程的分目標,各質(zhì)量分目標落實到具體人頭上,并實行經(jīng)濟承包,實行關(guān)鍵工序、關(guān)鍵時候重獎重罰、使每個項目員工和目標直接相關(guān),對目標負責(zé),并給每個項目員工以壓力、以動力、最大限度地調(diào)動和發(fā)揮每個員工的生產(chǎn)積極性和聰明才智,提高員工的質(zhì)量意識。
100% of the subdivisional works are qualified, 100% of them are constructed according to the drawings, 100% of the contract terms are implemented, and 100% of the completed services are provided to ensure the one-time acceptance of the qualified works. In order to achieve the overall quality objective, in the whole process of construction, take the objective management as the overall situation, take economic contracting as the lever, take the comprehensive promotion and application of ISO9001 quality standard as the means to carry out quality management, divide the overall quality objective of unit project into sub objectives of each sub project and sub project, implement each quality sub objective to specific people, and implement economic contracting, implement the key processes, reward and punish severely at critical times Make each project employee directly related to the goal, be responsible for the goal, and give each project employee pressure, motivation, maximum mobilization and play to each employee's production enthusiasm and intelligence, and improve the employee's quality awareness.
安全目標 Safety objectives
傷亡控制指標死亡率為零、重傷率為零,杜絕死亡事故的發(fā)生;安全生產(chǎn)、文明施工目標施工現(xiàn)場管理必須符合部頒標準(JGJ59—99)的要求,得分率必須達到85%?以上;安全管理人員持證率100%,特殊工種持證上崗率100%,施工現(xiàn)場安全各項設(shè)施合格率100%,安全防護設(shè)施使用率100%,勞動保護用品及防護用品合格率100%,發(fā)放、使用率100%;施工現(xiàn)場文明施工合格率100%。
The death rate and serious injury rate of the casualty control indicators are zero, so as to prevent the occurrence of fatal accidents; Safety production and civilized construction target construction site management must meet the requirements of the ministerial standard (JGJ59-99), and the scoring rate must be above 85%; The qualification rate of safety management personnel is 100%, the qualification rate of special types of work is 100%, the qualification rate of various safety facilities on the construction site is 100%, the utilization rate of safety protection facilities is 100%, the qualification rate of labor protection articles and protective articles is 100%, and the distribution and utilization rate is 100%; The qualification rate of civilized construction on the construction site is 100%.
文明目標 Civilization goal
加大管理力度、有計劃、有步驟地逐步改善作業(yè)環(huán)境和作業(yè)條件,杜絕和減少職業(yè)病、職業(yè)中毒事故的發(fā)生;嚴格執(zhí)行文明施工的有關(guān)規(guī)定,確保JGJ59-2011《建筑施工安全檢查標準》檢查達到合格標準;認真貫徹JGJ59-2011等相關(guān)標準規(guī)范和要求建立質(zhì)量、環(huán)境、職業(yè)健康安全標準施工現(xiàn)場。
Strengthen management, improve the working environment and conditions step by step in a planned way, and eliminate and reduce the occurrence of occupational diseases and poisoning accidents; Strictly implement the relevant regulations on civilized construction, and ensure that the inspection of JGJ59-2011 Standard for Safety Inspection of Building Construction reaches the qualified standard; Conscientiously implement JGJ59-2011 and other relevant standards, specifications and requirements to establish quality, environment, occupational health and safety standards on the construction site.
成本目標 Cost target
每份報價僅按成本10%作為公司管理費及利潤,嚴格控制人工、材料采購價格,采購過程中充分了解掌握市場行情,在保證質(zhì)量的前提下進行貨比三家,擇優(yōu)選購;預(yù)算精準,設(shè)計不變更,預(yù)算價即結(jié)算價。
Each quotation only takes 10% of the cost as the management fee and profit of the company, strictly controls the purchase price of labor and materials, fully understands and grasps the market situation during the purchase process, compares goods with three suppliers on the premise of ensuring the quality, and selects the best; The budget is accurate, the design is not changed, and the budget price is the settlement price.
工期目標 Duration target
嚴格按照開工通知的要求開工,100%按規(guī)定的工期竣工。
The commencement shall be carried out in strict accordance with the requirements of the Notice to Proceed, and the project shall be completed 100% according to the specified construction period.